PROJECTS


US-89; Farmington to I-84
Farmington, UT
​
Owner: Utah Department of Transportation (UDOT)
Contract Type: Progressive Design-Build
Cost: $525 million (total project value)
​
-
16-mile conversion of a four-lane highway to a grade-separated expressway
-
Prime consultant on the Environmental Impact Statement (EIS)
-
Extensive utility design and coordination
-
Utility conflict identification and relocation for all major utilities, including:
-
Water aqueducts​
-
High voltage power
-
High pressure gas
-
Petroleum gas lines
-
Communication system
-
-
Extensive third-party coordination
-
QL-D, QL-C, QL-B, & QL-A SUE services
-
Approximately 250 test-holes​
-
​


I-80, California-Nevada
State line Project
Reno, NV
​
Owner: Nevada Department of Transportation (NDOT)
Contract Type: Unit-Price Contract
Cost: $42 million
​
-
Full field investigation (QL-D, QL-C, QL-B, & QL-A) for 13 miles of freeway
-
Aggressive timeline
-
​All final project deliverables (QL-D, QL-C, & QL-B) required in five weeks
-
-
Field work began on day one; office work began on day two
- Field work beginning day one:​
- ​Survey control
- Designating
- Map creation
- Utility inspections
- Above ground topo/utility survey, etc.


US-6, US-50, US-93 Downtown ELY
Ely, NV
​
Owner: NDOT
Contract Type: Unit-Price
Cost: $12 million
​
-
NDOT's largest SUE project to date
-
QL-D, QL-C, QL-B, & QL-A SUE services​
-
-
Broader research and field surveys to accommodate limited or outdated utility records
-
Trenching (reduced necessary potholes)
-
20 separate locations​
-
-
GPR used to compose conflict matrix for risk assessment
-
Coordination, permitting, and traffic control


North Las Vegas Sewer Rehabilitation
North Las Vegas, NV
​
Owner: City of North Las Vegas
Contract Type: Unit-Price
Cost: $10 million
​
-
Condition assessment for significant portion of City of North Las Vegas sewer system
-
Assessment performed by NASSCO-certified Horrocks employees​
-
Pipe sizes ranging from 15- to 33-inches in diameter
-
-
Capital improvement rehabilitation report prepared with a cost estimate for design and construction


City Creek 84-inch
Storm Drain Rehabilitation
St. George, UT
​
Owner: City of St. George
Contract Type: Lump Sum
Cost: $500,000
​
-
Rehabilitation of 310 linear feet (LF) of 84-inch storm drain running through a gas station and busy city roadway​​
-
Slip-lined 72-inch fiberglass pipe​
-
Disturbed area limited to a shored 15-foot by 24-foot excavation
-
320 feet of Hobas pipe placed in less than five hours
-
Insertion pit completion, pipe slip-lining, bulk-head construction, and annular space grouting all completed within a week
-
-
No interruption of traffic during entire process
-
Gas station able to remain open to
public during rehabilitation

_edited_.jpg)
UDOT Region 2 Culvert
Condition Inventory
Salt Lake, Tooele, & Summit Counties, UT
Owner: UDOT Region 2
Contract Type: Hourly
Study Cost: $1.9 million
-
Inventory and evaluation of UDOT’s Region 2 culverts and storm drain system
-
Developed a rating system
-
Conducted field evaluations
-
Provided prioritized repair recommendations
-
Reported all information to client via UPLAN
-
-
Set up integration between ArcGIS Collector and Survey-123 for field data collection
-
Data displayed in a dashboard to monitor
collection progress -
Maintenance and replacement prioritization generated through a GIS algorithm